by Andrew Boghossian | Mar 27, 2026 | Deconstruction
Deconstruction stories Lansing Lake House In the fall of 2024, Finger Lakes ReUse had the opportunity to salvage materials from a lake house in Lansing. The 1929 building was built in a contemporary style with a shake façade. The building’s owner faced the tough...
by Andrew Boghossian | Sep 30, 2025 | Deconstruction
$0.75 per sq. ft. Contact Site of Salvage Freeville Type Insulation Material Fiberglass Characteristic Backed Bundled or Unbundled Bundled (8sqft per bag) Length (ft) 1′-4′ Width (in) 12″ Thickness (in) 12″ Unit Square foot Quantity...